Good Morning:

Here is a list of Materials Needed for our “Reconstruction” Project at our New Office Location for the Foundations for Recovery
Materials Needed:
1) Permits & Building Plans: OPEN ITEM
2) Framing: 232 linear feet of Framing
3) Drywall: 3,712 sq ft of drywall
4) Doors:  11 ( 3’x7’) Interior Doors
5) Locksets: 13 interior and 2 Exterior with Deadbolts
6) Electrical:  18 Outlets  (Switch ?)
7) HVAC: OPEN ITEM
8) DROP CEILING: OPEN ITEM
9) Insulation: 232 x 8 (1856 sf)
10)  Interior Windows: 4  (3×2)
11)  Finish Carpentry: Door Trim Sets 11 doors 2 sides  – Window Trim Sets 4 Windows 2 sides (Includes both sides of doors & windows)
12)  Finish Carpentry: Baseboards 1597.33 linear feet
13)  Flooring:  290 yards of flooring plus 10% waste– totals 319 yards
14)  Electrical: Relocation of Drop Ceiling Light Fixtures
15)  Kitchen Cabinets: OPEN ITEM
16)  Furniture: OPEN ITEM
17)  Security System: OPEN ITEM
18)  Window Coverings: OPEN ITEM
19)  Painting: Volunteers (need supplies)

new floor plan layout